Phase 0 Networking

From Interlock Rochester Wiki

(Difference between revisions)
Jump to: navigation, search
(Updated known status, asked some questions.)
Line 10: Line 10:
=== Needs ===
=== Needs ===
* 24 port switch that supports vlans
* 24 port switch that supports vlans
-
* DMARC board - Complete --[[User:MadScientist|MadScientist]] 14:03, 26 January 2010 (UTC)
+
* 12? x 6-port white wall plates - Bought? ETA? --[[User:Joshshua|Joshshua]] 15:12, 24 February 2010 (UTC)
-
* 10 x 6 port wall plates
+
* 75? x white keystone jacks - Bought? ETA? What happened to multiple colors? --[[User:Joshshua|Joshshua]] 15:12, 24 February 2010 (UTC)
-
* 60 x keystone jacks
+
* 10 x wall boxes - To be donated by neighbor Tim? --[[User:Joshshua|Joshshua]] 15:12, 24 February 2010 (UTC)
-
* 10 x wall boxes
+
* 60 x cat5(e) - Obtained
-
* 60 x cat5(e)
+
=== Wants ===
=== Wants ===
''not covered in this project''
''not covered in this project''
 +
* wall conduit - If this is not done before pulling wire, it won't be so easy to do. --[[User:Joshshua|Joshshua]] 15:12, 24 February 2010 (UTC)
* gigabit network capabilities
* gigabit network capabilities
* cisco catalyst 5505 Route & Switch Module
* cisco catalyst 5505 Route & Switch Module
-
* wall conduit
 
* LDAP server
* LDAP server
* second VPN server
* second VPN server
Line 27: Line 26:
=== Tasks ===
=== Tasks ===
Subtasks to complete the project.  Users are points of contacts on their subjects.
Subtasks to complete the project.  Users are points of contacts on their subjects.
 +
* DMARC/[[user:Igadget|Rowan]] - Complete --[[User:MadScientist|MadScientist]] 14:03, 26 January 2010 (UTC) - This should be relocated to the power panel wall --[[User:Joshshua|Joshshua]] 15:12, 24 February 2010 (UTC)
* LAN/Firewall Services: [[user:Ben Woodruff|Ben]]
* LAN/Firewall Services: [[user:Ben Woodruff|Ben]]
-
* Wiring/[[user:madscientist|Tim]]
+
* Wiring/[[User:MadScientist|Tim]] - Tentatively scheduled for evening of 2/25/10 --[[User:Joshshua|Joshshua]] 15:12, 24 February 2010 (UTC)
-
* DMARC/[[user:Igadget|Rowan]] - Complete --[[User:MadScientist|MadScientist]] 14:03, 26 January 2010 (UTC)
+
=== Costs ===
=== Costs ===
* Wall Plates
* Wall Plates
** http://www.monoprice.com/products/product.asp?c_id=105&cp_id=10517&cs_id=1051703&p_id=1103&seq=1&format=2
** http://www.monoprice.com/products/product.asp?c_id=105&cp_id=10517&cs_id=1051703&p_id=1103&seq=1&format=2
-
** 6 hole wall plates (white)
+
** 6 hole wall plates (white) (>10@$0.47/ea)
* Keystone jacks
* Keystone jacks
** http://www.monoprice.com/products/subdepartment.asp?c_id=105&cp_id=10513
** http://www.monoprice.com/products/subdepartment.asp?c_id=105&cp_id=10513
-
** Jacks in multiple colors >$1.50/ea
+
** CAT6 jacks in multiple colors (>60@$0.96/ea) - Multiple colors don't combine for bulk discounts. --[[User:Joshshua|Joshshua]] 15:12, 24 February 2010 (UTC)
* Wall boxes
* Wall boxes
 +
** Possibly free from our neighbor, Tim. --[[User:Joshshua|Joshshua]] 15:12, 24 February 2010 (UTC)
=== Used Resources ===
=== Used Resources ===
* PFsense Firewall
* PFsense Firewall
* Cisco 2950 24 port Switch
* Cisco 2950 24 port Switch

Revision as of 15:12, 24 February 2010

Contents

Phase 0 Networking

Overview

This project is to setup initial networking at Interlock

Goals:

  1. Make Long Term Decisions
  2. Keep costs to a minimum
  3. Keep the network simple and manageable

Needs

  • 24 port switch that supports vlans
  • 12? x 6-port white wall plates - Bought? ETA? --Joshshua 15:12, 24 February 2010 (UTC)
  • 75? x white keystone jacks - Bought? ETA? What happened to multiple colors? --Joshshua 15:12, 24 February 2010 (UTC)
  • 10 x wall boxes - To be donated by neighbor Tim? --Joshshua 15:12, 24 February 2010 (UTC)
  • 60 x cat5(e) - Obtained

Wants

not covered in this project

  • wall conduit - If this is not done before pulling wire, it won't be so easy to do. --Joshshua 15:12, 24 February 2010 (UTC)
  • gigabit network capabilities
  • cisco catalyst 5505 Route & Switch Module
  • LDAP server
  • second VPN server
  • 2600 Router

Tasks

Subtasks to complete the project. Users are points of contacts on their subjects.

  • DMARC/Rowan - Complete --MadScientist 14:03, 26 January 2010 (UTC) - This should be relocated to the power panel wall --Joshshua 15:12, 24 February 2010 (UTC)
  • LAN/Firewall Services: Ben
  • Wiring/Tim - Tentatively scheduled for evening of 2/25/10 --Joshshua 15:12, 24 February 2010 (UTC)

Costs

Used Resources

  • PFsense Firewall
  • Cisco 2950 24 port Switch